Architecture Firm · San Francisco Bay Area

Reducing Plan Check Rejections by 60%

An architecture firm transforms their code compliance workflow

Horizon Architecture

60%↓

Rejection Rate

Reduction in first-submission rejections (40% to 16%)

5 weeks

Time to Permit

Average reduction in permitting timeline

20 hrs/mo

Staff Efficiency

Saved on code research and correction cycles

Reducing Plan Check Rejections by 60%

1The Challenge

Horizon Architecture, a 25-person firm specializing in multi-family residential, was experiencing a 40% plan check rejection rate on first submissions. Each rejection cycle added 4-6 weeks to project timelines and required significant staff time to address corrections. The firm needed a way to catch compliance issues before submission without adding headcount.

2The Solution

Horizon implemented Rescope Recode as a pre-submission checkpoint in their workflow. Before any permit submission, project teams run plans through Rescope's compliance checking to identify code issues. The tool flags problems by severity, allowing teams to prioritize corrections and understand exactly which code sections apply.

3The Results

60%↓

Rejection Rate

Reduction in first-submission rejections (40% to 16%)

5 weeks

Time to Permit

Average reduction in permitting timeline

20 hrs/mo

Staff Efficiency

Saved on code research and correction cycles

"The plan check process used to be a black box. We'd submit and hope for the best. Now we know exactly what the reviewer will flag before we submit. Our first-time approval rate has transformed, and clients notice the faster timelines."

Rachel Kim

Principal, Horizon Architecture

About Horizon Architecture

Industry

Architecture Firm

Location

San Francisco Bay Area